The growth of the Phoenix roadway network developed through a combined roadway link and travel analysis zone statistical assessment of building ages. Infrastructure has been constructed ahead of and in concert with sprawling edge growth. Half of the current roadways were constructed after 1979 at the edges of the urbanized area (i.e., the 101, 202, and 303 loops).
Publication in review.